Well 9096/AWP#1
Horizontal well at 90° with 2,380 m reach. FRS-89 in open hole combined with lubricants — the well was drilled with no parameter limits.
Well profile
Project goals
- 01
Drill the horizontal with a mud motor to target TD
- 02
Cut torque below the operational limit
- 03
Transfer load to the bit
- 04
Stable BHA control across the full run
Technology
FRS
Frameless composite friction reducers. Installed on the drill pipe in zones of maximum side load. The pipe rotates inside a stationary composite sleeve pressed against the wellbore wall.
Plain-bearing principle
The drill pipe rotates inside a stationary composite sleeve. The sleeve is pressed against the wellbore wall or casing by lateral load — never touching the pipe body.
Friction coefficient < 0.06
Low-friction composite — Kompozit №1. For reference: steel on steel runs at 0.13 in the lab. 2×+ less friction.
1–2 min to install
Mounts on the pipe during a trip or on the catwalk. Held by two stop collars. No steel frame, no hinges inside the sleeve.
Key results
Conclusions and lessons
- 01
FRS + lubricants combined effect
DoneFRS combined with lubricants for friction reduction. The combined effect let the well be drilled with no parameter limits. Torque never reached make-up torque.
- 02
Stable BHA control
DoneNo directional issues — BHA control held steady across the full run.
We build FRS to your project conditions
We design and supply friction reduction systems for drilling. Tools are engineered for real well conditions and run as part of an engineering plan.
We run T&D — we don't guess
We work through the well data, constraints, and risks. The output: a configuration you can defend and a clear plan for the run.
We're on the rig with you
We support the project on site — align the run scenario, tune parameters, capture the result, and roll the learnings into the next well.
Run the numbers on your well
Send your well data and constraints — we'll run T&D modeling and come back with a configuration and the expected impact.