Field tests
Each case is a real well with documented parameters.
FRS
FRS-89, type 1
drill pipe 89
Hor 90° · Western Siberia
−33% torque, −33 t on POOH, +13 t on slack-off. Actual μ ~0.17 vs 0.25–0.30 forecast.
November 2025
FRS
FRS-89, type 1
drill pipe 89
Hor 90° · Eastern Siberia
Oscillator dropped. HD 2,661 m (actual) vs 2,096 m (no-FRS forecast). −19% torque, −14 t.
October 2025
FRS
FRS-127, type 1
drill pipe 127 + HWDP-147
Hor 88° · Western Siberia
−17% torque, −13 t on POOH, +10 t on slack-off. Well drilled to TD 3,990 m with no incidents.
August 2025
FRS
FRS-127, type 1
drill pipe 127 + HWDP-147
Hor 83° · Western Siberia
−36% torque, −20 t on POOH. Enables drilling without HWDP-147.
July 2025
FRS
FRS-127, type 1
drill pipe 127
S-shape 61° · Volga-Ural
2,745 m reach, −26% torque, −12 t on POOH. Unlocks wells with targets up to 3,200 m out.
June 2025
FRS
FRS-127, type 1
drill pipe 127
Hor 90° · Western Siberia
−31% torque, −15 t on POOH, slide ROP +50% (20 → 30 m/h).
March 2025
FRS
FRS-102, type 1
drill pipe 102
Hor 92° · Western Siberia
−39% torque, −11 t on POOH, slide ROP 12 m/h at 4,500 m. +500 m headroom for longer horizontal.
March 2025
We reply within a day
Run the numbers on your well
Send your well data and constraints — we'll run T&D modeling and come back with a configuration and the expected impact.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.