We're engineers.
Not distributors.

You don't get a box of tools — you get a full-cycle solution
that takes operational risk off the table.

*
Kompozit #1.
Our own development — engineered to deliver the results we promise.
History

We don't just sell tools — we own the outcome. We develop the technology, manufacture it, and stay with every project from scenario modeling to a verified result in the field.

Technology
Patented in-house technologies

No compromises when chasing the right result.

Production
In-house production

Continuous production cycle, predictable supply.

Engineering
Engineering by senior specialists

Continuous production cycle, predictable supply.

Technology
Patented in-house technologies

No compromises when chasing the right result.

Production
In-house production

Continuous production cycle, predictable supply.

Engineering
Engineering by senior specialists

Continuous production cycle, predictable supply.

About us

First in Russia to deploy frameless FRS protectors — and we built the material for them, with properties the market didn't have.

Frameless FRS protector made of Kompozit #1

Kompozit #1

Low-friction composite without a steel frame. Friction coefficient μ = 0.06 in wet contact with steel — steel itself runs at μ = 0.13.

Parameter Kompozit #1 Steel μ 0.06 0.13 Friction reduction –64% baseline

Frameless
FRS protector

Reduces friction, dampens vibration.

Sizes 88.9 101.6 127.0 149.2
About us

Facts in numbers

Fact
16

Different projects where our technology has been successfully deployed

Fact
40+

Operations completed across Russia

Fact
>1M

Revolutions of continuous drilling the equipment can take

Fact
2025

First frameless system technology deployed in Russia

Partners

Trusted by

Gazprom
Lukoil
Rosneft
SSC
Elbrus Drilling
Sakhalin Energy

November 2025

Hor 90° · Western Siberia

Open case →

October 2025

Hor 90° · Eastern Siberia

Open case →

August 2025

Hor 88° · Western Siberia

Open case →

July 2025

Hor 83° · Western Siberia

Open case →

June 2025

S-shape 61° · Volga-Ural

Open case →

April 2025

Verkhnesalymskoe field

Open case →

March 2025

Hor 90° · Western Siberia

Open case →

March 2025

Hor 92° · Western Siberia

Open case →

March 2025

Hor 83° · Western Siberia

Open case →

February 2025

S-shape 40° · Western Siberia

Open case →
Get in touch
We reply within a day

Run the numbers on your well

Send your well data and constraints — we'll run T&D modeling and come back with a configuration and the expected impact.

Contact us
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.