Hor 83° · Western Siberia

Well Field test №6

Horizontal well at 83°, 1,940 m reach. Goal: cut hook load on POOH against the rig hookload limit so similar wells can be drilled without HWDP-147.

TD
3,825 m
Reach
1,940 m
FRS count
90
HWDP-147
1,360 m
Inputs

Well profile

83°
Horizontal wellbore
3,825 m
TD
1,940 m
Horizontal reach
220.7 mm
Section 1,208–3,825 m
1.42 g/cm³
Water-based mud
245 mm
Casing shoe
Project goals

Project goals

  • 01

    Reduce hook load on POOH against the rig hookload limit

  • 02

    Drill similar wells without HWDP-147

  • 03

    Reduce drilling torque

Solution

Technology

FRS

FRS-127
FRS — Friction Reduction System

Frameless composite friction reducers. Installed on the drill pipe in zones of maximum side load. The pipe rotates inside a stationary composite sleeve pressed against the wellbore wall.

01

Plain-bearing principle

The drill pipe rotates inside a stationary composite sleeve. The sleeve is pressed against the wellbore wall or casing by lateral load — never touching the pipe body.

02

Friction coefficient < 0.06

Low-friction composite — Kompozit №1. For reference: steel on steel runs at 0.13 in the lab. 2×+ less friction.

03

1–2 min to install

Mounts on the pipe during a trip or on the catwalk. Held by two stop collars. No steel frame, no hinges inside the sleeve.

Outcome

Key results

22.5 → 14.4 kN·m
−36%
Bit torque
114 → 94 t
−20 t
Hook load on POOH
RIH
+5 t
Extra weight on slack-off
AFTER TRIP AT 3,000 m
−9 t
Effect at intermediate depth
Takeaways

Conclusions and lessons

  • 01

    Axial friction and torque reduction

    Done

    FRS confirmed the published spec on axial friction and torque reduction.

  • 02

    Drilling without HWDP

    Open

    FRS opens up similar wells without HWDP-147.

Equipment

We build FRS to your project conditions

We design and supply friction reduction systems for drilling. Tools are engineered for real well conditions and run as part of an engineering plan.

Engineering

We run T&D — we don't guess

We work through the well data, constraints, and risks. The output: a configuration you can defend and a clear plan for the run.

Field support

We're on the rig with you

We support the project on site — align the run scenario, tune parameters, capture the result, and roll the learnings into the next well.

Get in touch
We reply within a day

Run the numbers on your well

Send your well data and constraints — we'll run T&D modeling and come back with a configuration and the expected impact.

Contact us
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.